IS200TPROS1CBB燃機(jī)卡件,GE通用模塊
過電流保護(hù)電源提供電子過電流為3個(gè)輸出中的每一個(gè)提供保護(hù)。如果最大超過額定電流時(shí),電壓將降至低值。它將保持該狀態(tài),直到重新移動(dòng)或減少負(fù)載。電流過載(包括短路條件)不會(huì)導(dǎo)致保險(xiǎn)絲斷開。該電源不符合FCC對(duì)非工業(yè)應(yīng)用的要求交流電源線上的傳導(dǎo)電磁干擾。機(jī)架操作一個(gè)電源可以為兩個(gè)人供電以下條件下的機(jī)架:第二個(gè)機(jī)架只需要5伏電源
IS200TPROS1CBB燃機(jī)卡件,兩個(gè)機(jī)架所需的總功率與電源容量有關(guān)。第二個(gè)機(jī)架消耗的電流小于5.2安培。兩個(gè)機(jī)架必須緊密安裝受可用3英尺連接電纜的限制,用于雙機(jī)架操作的連接電纜為表1中列出了訂購信息。這條電纜承載+5伏電源總線和電源對(duì)信號(hào)進(jìn)行排序。它使用9針D型連接器它通過一個(gè)機(jī)架中的開口。注意,電纜承載僅限功率和功率排序信號(hào)。機(jī)架間通信和總線接口模塊必須單獨(dú)提供。參見適用的可編程控制器安裝手冊(cè)。申請(qǐng)信息。時(shí)序圖下面的時(shí)序圖顯示了交流電壓的關(guān)系直流輸出和電源產(chǎn)生的兩個(gè)系統(tǒng)信號(hào)的輸入功率:ACFAIL和系統(tǒng)重置。5VSTBY輸出可用于用戶電池備份方案如圖所示。通電時(shí),ACFAIL信號(hào)出錯(cuò)5伏總線在規(guī)格范圍內(nèi)后不久。SYSRESET將系統(tǒng)保持在重置狀態(tài)至少5伏電源可用后200毫秒(期間這一次,輸出被強(qiáng)制關(guān)閉)。如果交流輸入電源中斷,5伏總線將在規(guī)格范圍內(nèi)重新供電至少一個(gè)周期。這個(gè)然后,在SYSRESET停止所有操作之前,給系統(tǒng)額外5毫秒的時(shí)間來完成有序關(guān)機(jī)處理。
Overcurrent Protection
The power supply provides electronic overcurrent
protection for each of the 3 outputs. If the maximum
current rating is exceeded, the voltage will collapse to
a low value.
It will remain in that state until the load is either removed or reduced. A current overload (including a
short circuit condition) will not cause the fuse to open.
This power supply does not comply with FCC requirements in non-industrial applications for
conducted EMI on AC power lines.
Dual Rack Operation
A single power supply can provide power for two
racks under the following conditions:
Only 5 volt power is required in the second rack,
and the total power required by both racks is within the capability of the supply.
The current drawn by the second rack is less than
5.2 amperes.
The two racks must be mounted in close proximity
as limited by the available 3-foot connecting cableThe connecting cable used for dual rack operation is
listed in Table 1, Ordering Information. This cable
carries the +5 volts power bus as well as the power
sequencing signals. It uses a 9-pin D-type connector
which connects directly to the backplane through an
opening in the rack frame. Note that the cable carries
power and power sequencing signals only. Inter-rack
communication and bus interface modules must be
provided separately. See the applicable Programmable
Controller Installation Manual. for application information.Timing Diagram
The timing diagram below shows the relationship of the ac
input power to the dc outputs and to the two system signals generated by the power supply: ACFAIL and
SYSRESET. The 5VSTBY output may be used for user
battery backup schemes as shown.
On application of power, the ACFAIL signal goes false
soon after the 5 volt bus is within specification. The system is held in the Reset state by SYSRESET for at least